# Resource planning without spreadsheets that drift apart.

> In Capazeit, the project plan, allocation and utilisation sit in one data model. When you move a date, you see at once which people and weeks it affects.

https://capazeit.com/en/resource-planning-without-spreadsheets · Last updated: 28 November 2026

## The spreadsheet holds up until a date changes.

In many teams, resource planning starts in Excel, and that is sensible: a spreadsheet is quick to set up and everyone can read it. The trouble starts when a project slips. The new dates have to go into the project plan, each person's allocation has to be adjusted, and someone has to check that utilisation still adds up. That usually happens across several files, and often under time pressure.

## A spreadsheet knows nothing about connections.

A cell does not know that it belongs to a project that has just moved. Project plan, allocation and utilisation are therefore three separate calculations, and they match only as long as someone reconciles them by hand. Every copy, every version in an email attachment and every formula that shifts when a row is inserted widens the gap. The error rarely shows up when you enter it, but only once a person is double-booked in the same week.

## One data model instead of three files.

In Capazeit, the Gantt chart, the resource matrix (“Ressourcenmatrix”) and the capacity view (“Kapazitätsansicht”) are not separate lists but three views of the same data. In the Gantt chart, dates are planned to the day, and dependencies move along when you shift a task. The resource matrix shows the same hours by person and week. The capacity view sets them against the time available and shows free and overbooked time. A change in one place is visible in the other two at once, with no export and no reconciliation.

## Whole minutes, so the totals add up.

Capazeit keeps all hours as whole minutes. This means there are no rounding differences between Gantt, matrix and capacity, of the kind that decimal hours in spreadsheets easily produce. Fixed hours stay where they are, even when the project moves. And a deliberately fixed zero is not the same as an empty cell: it records that nobody works on this project that week, whereas an empty cell only means that nothing has been planned yet.

## A project slips by two days. Here is how it looks.

1. **Move the date** The Kundenportal (customer portal) project starts two days later because the client's content is missing. You move the bar in the Gantt chart, with the mouse or the arrow keys, one day per press.
2. **Dependencies move along** The dependent tasks, build and testing, move with it.
3. **Hours shift on** In the resource matrix, Anna Keller's hours move into the following week. There the Kundenportal meets a second project.
4. **The bottleneck appears** The capacity view marks Anna's week as overbooked. How to resolve the bottleneck is up to you: move another project, redistribute hours or discuss the date again.
5. **Back with undo** If the move was a mistake, undo reverses it. The history shows who changed what, and when.

*Sample data*

## Several planners, one current version.

With spreadsheets, copies multiply quickly: one in an email, one on the shared drive, one with yesterday's changes. In Capazeit, other people's changes appear live. Whatever someone is editing is locked briefly, so nobody overwrites anyone else. Saved views with filter and zoom can be shared as a link, so everyone looks at the same section. Live collaboration and saved views belong to the Team plan.

## What Capazeit is not.

- **Not shift or rota planning.** Capazeit plans project work: dates to the day, hours per person and week.
- **Not automatic scheduling.** Capazeit shows overload and the consequences of a move, but it does not redistribute work on its own.
- **No connection to other tools.** Integrations do not exist yet. Quotes and invoices are outside its scope. How your current plan is carried over is covered in a personal conversation at the start.

## Frequently asked questions

### Can Capazeit replace resource planning in Excel?

For planning people across several projects, yes: dates, allocation and utilisation sit in one data model and stay in sync when something moves. Capazeit does not cover quotes, invoices or shift plans.

### Why does Capazeit calculate in minutes rather than decimal hours?

Whole minutes can be added without rounding. That way Gantt, matrix and capacity always give the same total.

### What happens when two people plan at the same time?

Changes appear live for everyone, and whatever someone is editing is locked briefly. Every change can be reversed with undo.

### Which teams is Capazeit meant for?

Small and medium-sized teams that plan several projects with the same people. The Focus, Team and Organisation plans differ in scope; prices will follow.

## More on this topic

- [Team capacity planning](https://capazeit.com/en/team-capacity-planning.md): Plan utilisation and overload in your team
- [Team leave planning](https://capazeit.com/en/team-leave-planning.md): Leave and public holidays in capacity
- [Gantt, resource matrix and capacity](https://capazeit.com/en/features.md)
- [Plan live and protected](https://capazeit.com/en/features.md)
- [Plan utilisation and overload in your team](https://capazeit.com/en/team-capacity-planning.md)
- [Leave and public holidays in capacity](https://capazeit.com/en/team-leave-planning.md)
- [What each plan includes](https://capazeit.com/en/pricing.md)
- [Request access](https://capazeit.com/en/access.md)
- [Ask about switching over](https://capazeit.com/en/contact.md)

## One plan that everyone refers to.

Capazeit is in early access. Every request gets a personal reply from St. Gallen, with time to talk through how your planning looks today. [Request access](https://capazeit.com/en/access.md) · [Contact](https://capazeit.com/en/contact.md)
