# Project forecasting: know where a project will land while it is still running.

> For each project, Capazeit tracks effort, actuals, estimate to complete (ETC) and estimate at completion (EAC). An overrun shows while there is still time to act.

https://capazeit.com/en/project-forecasting · Last updated: 28 November 2026

## Actuals say little while the rest is still open.

Midway through a project, the honest answer to “Will the budget last?” is often a gut feeling. The hours worked so far are known; the remaining effort is not. Whether the project stays within limits then only shows at final billing, when nothing can be changed any more.

## A forecast needs two figures, not one.

What matters is not how much has been done, but how much is still to come. The estimate at completion (EAC) is the sum of actuals and the estimate to complete (ETC). If it is above the planned effort, the project needs more than provided for. The sum is simple; it only becomes reliable when the remaining effort and the plan rest on the same basis.

## Effort, actuals, ETC and EAC sit side by side for each project.

For every project, Capazeit shows planned effort, actuals, remaining effort and expected total effort at a glance. The forecast lives in the same data model as the Gantt chart and the resource matrix; there is no separate list to keep up to date. In the portfolio, running projects stand next to each other, so it is clear which one is running out of bounds.

## Scenarios show the what-if, baselines show the distance travelled.

Before a decision is made, a scenario lets you play out what it would do: a later start, an extra phase, a different order, without changing the live plan. The baseline records the original plan. The comparison shows how far dates have moved since, for instance by two days for testing.

## Kundenportal: 14 hours over budget, midway through the project.

1. **Budget and actuals** The Kundenportal (customer portal) is budgeted at 150 hours. So far 80 hours have been worked, and the actual hours arrive by CSV import from time tracking.
2. **Estimate to complete (ETC)** Capazeit works out the remaining effort as 84 hours: the larger of target minus actuals and fixed future plus unplanned remainder. That gives an expected total effort of 164 hours, 14 hours over budget.
3. **What if** In a scenario, the testing phase is shortened. The comparison with the baseline shows how the dates change against the original plan.
4. **The conversation with the client** With these figures, the project lead goes into the conversation with the client: adjust the scope, raise the budget or deliver later, while all three options are still open.

*Sample data*

## What Capazeit is not.

- **Not accounting.** Quotes, invoices and payroll costs are outside its scope.
- **Not time tracking.** Capazeit does not record working time. Actual hours are taken over from time tracking by CSV import, by a planner or admin.
- **Not automatic estimating.** The remaining effort follows from target, actuals and plan; Capazeit makes the consequences visible, and the team judges them.

## Frequently asked questions

### What do ETC and EAC mean?

ETC (estimate to complete) is the remaining effort until completion. EAC (estimate at completion) is the expected total effort, that is, actuals plus ETC.

### What is the difference between a scenario and a baseline?

A scenario plays out a possible change without altering the live plan until “Änderungen übernehmen” (apply changes) is chosen. A baseline records the original plan as a reference against which the current state is compared.

### Which plan includes the forecast?

Forecast, scenarios and baselines belong to the Team and Organisation plans. Prices will follow.

### Where can you see all projects together?

In the portfolio, running projects stand next to each other, and the risk view gathers overload and schedule risks in one place.

## More on this topic

- [Resource planning without spreadsheets](https://capazeit.com/en/resource-planning-without-spreadsheets.md): Resource planning in one data model
- [Team capacity planning](https://capazeit.com/en/team-capacity-planning.md): Spot team overload early
- [Forecast, scenarios and baselines](https://capazeit.com/en/features.md)
- [Spot team overload early](https://capazeit.com/en/team-capacity-planning.md)
- [Resource planning in one data model](https://capazeit.com/en/resource-planning-without-spreadsheets.md)
- [The Team plan compared](https://capazeit.com/en/pricing.md)
- [Request access](https://capazeit.com/en/access.md)
- [Ask about the forecast](https://capazeit.com/en/contact.md)

## Know early where a project will land.

Capazeit is in early access. The founder replies to every request personally, including to the question of which plan suits your projects. [Request access](https://capazeit.com/en/access.md) · [Contact](https://capazeit.com/en/contact.md)